Photo Album: Concrete Deck is Pooling Water, Boston, MA
A homeowner in Boston, Massachusetts, had recently finished their basement. They had seen water pooling on their concrete deck against the foundation and didn't want the water to seep into their finished basement. The concrete pad had voids beneath it which forced it to pitch towards the home. Our design specialist examined the concrete deck and recommended injecting PolyLevel to fill the voids and address the issue.
Our production team installed PolyLevel under the concrete deck through various injection ports to evenly distribute the material. As the polymer foam expanded and solidified in the voids, the concrete slab successfully lifted. By the end of the project, the slab no longer pitched towards the home, and water now flows away from the foundation walls.
Concrete Deck is Pitched
The deck is pitched toward the home and water is pooling.
Injection Ports
The injection ports are drilled.
Crew Injects PolyLevel
The crew injects the PolyLevel through the deck.
Concrete Deck is Lifted
The concrete deck is lifted and pitched away from the home.