Main Beam and Old Supports
The main beam has some cracks in it and the old supports arent holding up the beam as well as they used to.
Concrete is Chipped Out
The crew chips out a section of concrete to be able to fit the footing of the SmartJacks.
SmartJacks Footing is Inserted
The crew inserts the footing in the hole and secured the SmartJacks to the main beam.
Top of SmartJack Secured
The top of the SmartJack is secured to the main support beam and the crew will tighten the bolt to apply upward pressure.
Concrete is Poured Over the Footing
The crew pours concrete over the footing of the SmartJask to secure the footing in place.