Before SmartJacks
Before the SmartJacks were installed there were concrete posts.
Holes for the Footings are Dug
After the hole is dug crushed stone is poured into the hole.
Crushed Stone is Poured in the Hole
The crushed stone is poured into the hole to have the footing of the SmartJack rest on them.
SmartJacks Installed
The SmartJacks are installed and the team pours concrete over the footing to secure the bottom of the SmartJacks and to not cause a tripping hazard.