2'x2'x2' Hole is Dug
A 2'x2'x2' hole is dug for each SmartJack.
Crushed Stone and Rebar
Crushed stone and rebar are placed in the hole.
SmartJacks are Installed
The SmartJacks are installed over the concrete and connected to the main support beam.
Job Specific Concrete
For most jobs, the footing would be covered with concrete to match the other concrete but since there was a dirt floor at this job the customer opted for a full concrete floor to be poured.
Concrete is Poured
The concrete is poured over the crushed stone and rebar to give a solid base on to place the footing of the SmartJack on.