Lally Columns in Basement, Bedford, NH
The lally columns in the basement before they were replaced by SmartJacks.
Lally Column Being Chipped Out
The crew chipped out to the lally column so that they can eventually install the SmartJacks.
Chipped Out Section
This chipped-out concrete is for the footing of the SmartJacks.
SmartJacks Footing Placed in Chipped-out Section
The footing of the SmartJacks was put in the chipped-out section of the concrete.
Concrete Covered the Footing
Poured concrete to cover the footing and secure the SmartJack to the floor.
Full View of the SmartJack
This is the final product of the SmartJacks